Mines & Megawatts — US data centers mockup Attribution and licences (16 November 2026) This folder contains a derived database of US data center campuses. Campus points and the roster used for state totals Source: Data Centers Near Me, 2026-09-15. Compiled from US public records, OpenStreetMap and named public directories. Retrieved from https://datacentersnearme.org/data. Licence: Open Database License (ODbL) 1.0 — https://opendatacommons.org/licenses/odbl/1-0/ The source file itself contains data from OpenStreetMap contributors and DataCentersExposed (both ODbL) and from AI GridWatch (CC BY 4.0). © OpenStreetMap contributors — https://www.openstreetmap.org/copyright DataCentersNearMe withheld 666 campuses from the download (rows whose only source is Cleanview, and Cleanview-sourced status, coordinates, capacity and water on the rest). If you publish a database derived from datacenters_odbl.geojson or from the roster in stats.json, you must also offer that database under the ODbL and keep this attribution. State boundaries U.S. Census Bureau, Cartographic Boundary Files, cb_2024_us_state_20m, https://www2.census.gov/geo/tiger/GENZ2024/shp/cb_2024_us_state_20m.zip. United States public domain. Electricity rates U.S. Energy Information Administration, Electric Power Monthly Table 5.6.A, August 2026 (preliminary), https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_5_6_a. United States public domain. Basemap (the web map, not this folder) OpenFreeMap / OpenMapTiles, © OpenStreetMap contributors. Estimates Annual energy and cost figures are estimates (50% load factor per LBNL 2024, https://eta-publications.lbl.gov/sites/default/files/2024-12/lbnl-2024-united-states-data-center-energy-usage-report_1.pdf; state industrial average prices from EIA). They are labeled as estimates and are not filed costs.